Maillardville Community Centre

Project Detail

Completed in the Fall of 2022, the new 22,000 square foot facility doubles the size of the previous community centre and features the City’s first ever dedicated gym. The centre features modern amenities include a teaching kitchen, a combined youth and seniors lounge, a kid-centric space, a studio fitness space, and more.

ProjectMaillardville Community CentreClientEnersolv Design & BuildProject TypeNew ConstructionLocationCoquitlam, BCServices ProvidedCxShare

Goal of the project

This new-construction project delivered an all-electric community centre with no gas connection — a fully electrified mechanical design built around heat recovery ventilators, VRF systems, and electric resistance heating. The goal was to commission these systems and verify that the building performed to design intent, delivering reliable comfort across its gymnasium, fitness, childcare, and community spaces on an all-electric basis.

How did KCx achieve goal

KCx Engineering delivered commissioning for the project. Our team verified the performance of the heat recovery ventilators, VRF systems, and electric resistance heating, confirming that each operated as designed and that the control sequences coordinating them delivered appropriate conditions across the building’s varied spaces.

Commissioning confirmed that the ventilation, heating, and cooling systems worked together to meet the demands of a busy multi-purpose facility — verifying, through testing, that the all-electric design delivered the comfort and reliability the community centre’s wide range of programs requires.